Steps in Post-Construction Antitermite Treatment

If there is loose soil around the walls of your building, we dig a shovel width trench close to the external wall of the building exposing the foundation wall surface upto a depth of 50cm.
If there exists a concrete cover or masonry apron around the walls of your building, holes are drilled as close as possible to the plinth wall about 300mm (1ft) apart from each other.
If your building is on pillars, the holes are drilled around the pillars and insecticide poured into the soil.
Further, on all floors, wood work like doors and windows, which are highly susceptible to termite attack are also protected by treatment.
Spot treatment of spraying on infested areas in the walls and ceiling is also carried out.